Projects focused on the implementation and modernization of high voltage substations with an emphasis on efficiency and reliability, conducted with the technical and operational standards that characterize BR Infra.
BR Infra executed the retrofit and modernization of the Anhanguera Substation in Aparecida de Goiânia, ensuring greater reliability, efficiency, and safety for the operating power transmission system.
The scope included the preparation of as-built engineering documentation, civil works, and electromechanical and electrical works for transmission substations at primary voltages equal to or greater than 230 kV. Strategic replacements of banks 1, 2, 6, and the reserve unit were also carried out, along with necessary adaptations to meet the new system demands.
With strict deadlines and ERP-integrated management, BR Infra ensured that every stage was executed with technical quality, traceability, and governance.
The project was planned to maintain operational continuity, reduce risks, and ensure safety throughout the replacement and modernization process.
The Anhanguera Substation project in Aparecida de Goiânia reflects BR Infra’s commitment to technical excellence and sustainability in Brazil’s power sector, delivering works that strengthen the transmission network and contribute to the region’s development.