Anhanguera II Substation

Projects focused on the implementation and modernization of high voltage substations with an emphasis on efficiency and reliability, conducted with the technical and operational standards that characterize BR Infra.

power transmission brinfra 02

BR Infra executed the retrofit and modernization of the Anhanguera Substation in Aparecida de Goiânia, ensuring greater reliability, efficiency, and safety for the operating power transmission system.

Brownfield Modernization Project

The scope included the preparation of as-built engineering documentation, civil works, and electromechanical and electrical works for transmission substations at primary voltages equal to or greater than 230 kV. Strategic replacements of banks 1, 2, 6, and the reserve unit were also carried out, along with necessary adaptations to meet the new system demands.

Execution with Quality and Safety

With strict deadlines and ERP-integrated management, BR Infra ensured that every stage was executed with technical quality, traceability, and governance.

The project was planned to maintain operational continuity, reduce risks, and ensure safety throughout the replacement and modernization process.

Results Achieved

  • Complete modernization of 230 kV power equipment;
  • Civil and electromechanical adaptations to support the new structures;
  • Preparation of final, updated as-built engineering documentation;
  • Delivered within the contractual deadline, with enhanced reliability.

BR Infra Commitment

The Anhanguera Substation project in Aparecida de Goiânia reflects BR Infra’s commitment to technical excellence and sustainability in Brazil’s power sector, delivering works that strengthen the transmission network and contribute to the region’s development.

Much more than construction

We connect people, energy and progress

More than delivering infrastructure, BR Infra delivers purpose. With a team driven by excellence in execution, we transform challenges into solutions that drive the country’s development.

How can we help?

Fill out the form so our technical team can contact you.

Explore other Projects

Serra – ES

Vitória 345/138/13.8 kV Substation — Stages 20P and 21R

Share on social media

Excellence in Engineering, Procurement and Construction (EPC)

Transform your project with BR Infra's expertise

With 18 years of experience and proven technical capability, BR Infra executes complex projects with integrated management and total focus on performance. Count on those who deliver results that energize Brazil.