BR Infra acts as a strategic partner across every stage of electrical infrastructure implementation. From studies and engineering to construction, commissioning, and handover, we operate with discipline, method, and an absolute focus on quality. Each solution is guided by technical expertise, governance, and the culture of execution that sets us apart in the sector.
Our EPC methodology is supported by pillars that go beyond the basics, ensuring not only delivery, but excellence throughout every stage of the project.
We hold Technical Capability Certificates for highly complex projects, including the Cachoeira Paulista (500 kV) and Anhanguera (230 kV) substations. It is not a promise; it is proven capability.
Greater agility and control through our own warehouse and ERP-integrated management. We optimize resources and timelines, delivering efficiency that translates into greater reliability for you.
Our engineers oversee every phase, from design to as-built documentation. This integrated approach reduces friction, anticipates risks, and ensures that what is planned is precisely what is executed.
Check out what industry leaders say about the experience of working with an engineering firm that delivers on its promises.

Utility EngineerCampos de Goytacazes Substation–RJ

Project CoordinatorAnhanguera Substation–GO

Transmission ManagerCachoeira Paulista Substation–SP
We work on greenfield construction and brownfield retrofit projects for power substations, covering basic and detailed engineering, earthworks, civil works, electromechanical and electrical installation, supply of materials and equipment, and special telecommunications, protection, and control systems.
Complete execution of new power substations, including basic and detailed engineering, civil works, and electromechanical installation up to 500 kV.
Modernization and adjustments of existing substations, with equipment replacement, capacity expansion, and updating of auxiliary systems.
We follow an integrated EPC flow — from engineering to as-built documentation — to ensure quality, safety, and compliance with deadlines in every project.
BR Infra has proven experience through Technical Capacity Certificates issued in the name of the company and its professionals.
BR Infra has a warehouse and support center located in Goiânia-GO, with its own structure, assets, and fleet, including operations with container rentals.
Our processes are all managed through ERP, integrating all our operations, which guarantees efficiency, agility, and management governance.
We combine technical experience, integrated management, and commitment to deadlines to deliver safe, efficient, and high-impact works in the Brazilian power sector.
18 years of operation and technical certificates in Substations up to 500kV.
Projects carried out throughout Brazil, always completed within the contracted deadlines.
Processes controlled by ERP, ensuring quality, governance, and efficiency.
Highly qualified team with know-how in engineering, assembly, and commissioning.
Discover projects that turned complex challenges into energy infrastructure and national progress.