Projects focused on the implementation and modernization of high voltage substations with an emphasis on efficiency and reliability, conducted with the technical and operational standards that characterize BR Infra.
BR Infra executed the modernization of the Cachoeira Paulista Substation, located in the state of São Paulo, ensuring greater reliability and safety for the high-voltage power transmission system.
O projeto envolveu obras civis e montagem eletromecânica voltadas à substituição de equipamentos críticos. One of the key activities was the replacement of the 500 kV disconnect switch, an essential piece of equipment for the safety and operation of the transmission system.
The work required detailed planning to integrate new equipment into the existing structure, ensuring that the modernization was carried out without compromising power supply continuity.
BR Infra applied ERP-integrated management processes, ensuring traceability at all stages, from procurement through commissioning.
Successful replacement of the 500 kV disconnect switch;
Electromechanical installation and supporting civil adaptations;
Operational continuity ensured throughout the interventions.
With the modernization of the Cachoeira Paulista Substation, BR Infra reinforces its mission to deliver power infrastructure projects with technical excellence, safety, and strict deadline compliance, contributing to the reliability of Brazil’s power grid.