Anhanguera Substation

Projects focused on the implementation and modernization of high voltage substations with an emphasis on efficiency and reliability, conducted with the technical and operational standards that characterize BR Infra.

placeholder blog 9

BR Infra worked at the Anhanguera Substation in Goiânia, GO, focusing on increasing the efficiency of the electrical system through detailed engineering, civil works, electromechanical installation, and the installation of a high-voltage capacitor bank.

Project Scope

The project involved detailed engineering, execution of civil and electromechanical works, and the supply of materials, ensuring technical integration between engineering and field operations.

As a core part of the scope, a 138 kV, 80 MVAr capacitor bank was installed, including all associated connections, to improve electrical performance and system stability.

Technical Execution

BR Infra mobilized its specialized team to execute the project with detailed planning, technical control, and integrated ERP-based management.

The activities were carried out in compliance with applicable standards, ensuring safety, quality, and traceability at every stage—from engineering to final handover.

Results Achieved

  • Preparation of detailed engineering designs for system implementation;
  • Project execution of civil works and electromechanical works at a 138 kV substation;
  • Installation of a 138 kV – 80 MVAr capacitor bank;
  • Safe integration of the associated connections;
  • Delivery within the contractual deadline, with increased operational efficiency.

BR Infra Commitment

The Anhanguera Substation project – Goiânia reaffirms BR Infra’s ability to execute high-voltage works with technical precision, organization, and strict compliance with deadlines, contributing to the reliability and performance of the regional electrical system.

Much more than construction

We connect people, energy and progress

More than delivering infrastructure, BR Infra delivers purpose. With a team driven by excellence in execution, we transform challenges into solutions that drive the country’s development.

How can we help?

Fill out the form so our technical team can contact you.

Explore other Projects

Serra – ES

Vitória 345/138/13.8 kV Substation — Stages 20P and 21R

Share on social media

Excellence in Engineering, Procurement and Construction (EPC)

Transform your project with BR Infra's expertise

With 18 years of experience and proven technical capability, BR Infra executes complex projects with integrated management and total focus on performance. Count on those who deliver results that energize Brazil.