Projects focused on the implementation and modernization of high voltage substations with an emphasis on efficiency and reliability, conducted with the technical and operational standards that characterize BR Infra.
BR Infra worked at the Anhanguera Substation in Goiânia, GO, focusing on increasing the efficiency of the electrical system through detailed engineering, civil works, electromechanical installation, and the installation of a high-voltage capacitor bank.
The project involved detailed engineering, execution of civil and electromechanical works, and the supply of materials, ensuring technical integration between engineering and field operations.
As a core part of the scope, a 138 kV, 80 MVAr capacitor bank was installed, including all associated connections, to improve electrical performance and system stability.
BR Infra mobilized its specialized team to execute the project with detailed planning, technical control, and integrated ERP-based management.
The activities were carried out in compliance with applicable standards, ensuring safety, quality, and traceability at every stage—from engineering to final handover.
The Anhanguera Substation project – Goiânia reaffirms BR Infra’s ability to execute high-voltage works with technical precision, organization, and strict compliance with deadlines, contributing to the reliability and performance of the regional electrical system.