BR Infra carried out the modernization of the Itapaci Substation, increasing its reliability and efficiency through civil works, electromechanical installation, and electrical upgrades at 230 kV.

Project Scope

The project included the upgrade of the 230 kV bay, converting the BPT arrangement (main and transfer bus) to BD4 (double bus with four disconnect switches), including the Maracá 230 kV transmission line bay.

In addition, BR Infra implemented a new 230 kV, 50 MVAr capacitor bank and modernized the auxiliary services system, increasing operational reliability.

Technical Execution

Civil works, electromechanical installation, and electrical works were carried out with a high level of detail, ensuring seamless integration between the upgrades and existing systems.

The management of the stages was conducted with a focus on safety, quality, and traceability, using an ERP system for real-time monitoring.

Results Achieved

  • Upgrade of the 230 kV bay from BPT to BD4 arrangement;
  • Installation of a 230 kV – 50 MVAr capacitor bank;
  • Implementation of a new auxiliary services system;
  • Delivered within the contractual deadline, with enhanced operational safety.

BR Infra Commitment

The Itapaci Substation project reflects BR Infra’s ability to execute complex high-voltage modernization works, ensuring reliability for the electrical system and contributing to the expansion of power infrastructure in Goiás.

Much more than construction

We connect people, energy and progress

More than delivering infrastructure, BR Infra delivers purpose. With a team driven by excellence in execution, we transform challenges into solutions that drive the country’s development.

How can we help?

Fill out the form so our technical team can contact you.

Explore other Projects

Serra – ES

Vitória 345/138/13.8 kV Substation — Stages 20P and 21R

Share on social media

Excellence in Engineering, Procurement and Construction (EPC)

Transform your project with BR Infra's expertise

With 18 years of experience and proven technical capability, BR Infra executes complex projects with integrated management and total focus on performance. Count on those who deliver results that energize Brazil.