Planalto Substation

Projects focused on the implementation and modernization of high voltage substations with an emphasis on efficiency and reliability, conducted with the technical and operational standards that characterize BR Infra.

power transmission brinfra 02

BR Infra carried out the execution and modernization of the Planalto Substation in Morrinhos, GO, focusing on efficiency, safety, and increased operational reliability at 230 kV.

Project Scope

The work included civil, electromechanical, and electrical works for transmission substations at primary voltages equal to or greater than 230 kV.

In addition, as-built engineering documentation was prepared, ensuring up-to-date technical documentation compliant with regulatory standards.

The scope also included the supply of equipment and materials required for the full execution of the work.

Technical Execution

BR Infra mobilized its specialized team to execute every stage of the project with integrated ERP-based management, ensuring traceability, governance, and schedule compliance.

Each intervention was planned to ensure reliability and safety during the implementation of improvements and adjustments.

Results Achieved

  • Civil, electrical, and electromechanical works completed at 230 kV;
  • Preparation and delivery of as-built engineering documentation;
  • Full supply of equipment and materials;
  • Work delivered on time, with increased reliability.

BR Infra Commitment

The Planalto Substation project reinforces BR Infra’s role as a strategic partner in the development of energy infrastructure in Goiás, delivering robust and sustainable solutions for the transmission sector.

Much more than construction

We connect people, energy and progress

More than delivering infrastructure, BR Infra delivers purpose. With a team driven by excellence in execution, we transform challenges into solutions that drive the country’s development.

How can we help?

Fill out the form so our technical team can contact you.

Explore other Projects

Serra – ES

Vitória 345/138/13.8 kV Substation — Stages 20P and 21R

Share on social media

Excellence in Engineering, Procurement and Construction (EPC)

Transform your project with BR Infra's expertise

With 18 years of experience and proven technical capability, BR Infra executes complex projects with integrated management and total focus on performance. Count on those who deliver results that energize Brazil.